The Investment

Don't spend six figures guessing. ADU Feasibility Study: $497 (Empty Lot $997)

14 business days, or 21 for an empty lot. One report. Every question your spouse, your lender, and your CPA will ask before you sign a build contract, answered with paperwork.

Find my study One question, then you can start right away.
Full refund if we can't build, minus processing fees Credited toward build contract A permitting budget built in, in writing

Start Here

Where will your new home go?

It is one feasibility study. Undeveloped land takes more research, so we ask first.

For a property with a home

$497

One-time. Your report in 14 business days.

Begin my study: $497

Secure checkout. Refundable if we can't build.

You have a home and a yard. You get a property-specific yes or no, the permit path, the real costs, and the right model before you commit a dollar to a build.

  • County property & parcel records review
  • Zoning, setback & lot-coverage analysis
  • Utility hookup feasibility (sewer, water, electrical)
  • Permit cost & timeline projection for your city
  • Recommended model + style for your lot
  • Preliminary site plan (ADU placement concept)
  • Written PDF report

Not part of the study: on-site geotechnical boring or architectural renderings.

For undeveloped land

$997

One-time. Your report in 21 business days.

Begin my study: $997

Secure checkout. Refundable if we can't build.

You own, or are buying, an empty lot. It is the same study with more research: what the parcel can support, how to bring utilities and access to it, and what it takes to break ground.

  • Everything in the standard study
  • Raw-land buildability assessment
  • Site access & grading evaluation
  • Utility-to-lot extension feasibility & cost factors
  • Deeper entitlement / permit-path research
  • Site-development cost considerations
  • Written PDF report

Not part of the study: on-site geotechnical boring.

Full refund, minus payment processing fees, if your property cannot host an ADU. Credited toward your build if you sign within 90 days.

Google 4.9BBBA+MFG#1595931CSLB#1047146Yelp5.0

The Problem

Most homeowners discover their ADU is impossible after they've already signed a contract.

It happens like this. You meet a builder. You like them. You sign a five-figure design contract. Six months later, after the architect, the plans, the soils tests, they tell you: "Turns out your sewer line crosses an easement we can't build over. Sorry."

You've paid for design work you can never use. Six months gone. Often the deposit isn't refundable.

The feasibility study is what stops that from happening to you. $497 and 14 business days for a home with a yard, $997 and 21 business days for raw land. Either we hand you a roadmap to build, or we hand you back your money.

Why Families Use the Study

A clear answer before you commit to anything.

Full refund, minus payment processing fees, if your property cannot host an ADU. Credited toward your build if you sign within 90 days.

Sharon CherianVerified Google Review

Cathy at Framework First was very helpful.

She chatted with me prior to our scheduled meeting, and she had great insight and advice even though my situation was one that didn't end up requiring her business. Highly recommend this company if you want to build an ADU.

Questions Before You Pay

Ask anything.

What if you find my property CAN'T host an ADU?

Full refund, minus payment processing fees. If we find your property cannot host an ADU, we hand back the fee rather than build a home that can't be permitted. When a study comes back 'not feasible,' it's usually lot coverage, easements, or sewer access.

Does the feasibility study count toward my build contract?

Yes. 100% of the feasibility study fee is credited toward your build contract if you sign with us within 90 days. So your real cost is $0 if you build with us. The fee is refunded only if we find your property cannot host an ADU; otherwise it credits toward your build.

How fast do you start?

Within 1 to 2 business days of payment, our team reaches out to confirm your property details.

Why does the price depend on my property?

It is one study. For a property that already has a home on it, the study is $497: we confirm your lot can host an ADU, map the permit path, and recommend the right model. Undeveloped land takes more research, so that study is $997: we assess buildability from the ground up, including utilities, access, grading, and entitlements. If you're not sure which fits, start with the free property analysis below and we'll tell you.

Not Ready to Pay?

Start with the free property analysis.

The feasibility study is Step 04 of our process, and most families start at Step 01. The free 30-minute Online Property Analysis comes first: an Account Manager pulls your property records, checks setbacks and lot coverage, and tells you straight whether an ADU makes sense before you spend a dollar.

  • 01Free, 30 minutes, by phone, no obligation
  • 02A clear yes or no on whether your lot can host an ADU
  • 03Which model footprints fit, and whether a paid study is even worth it

Free Online Property Analysis

Open in new tab ↗

Form not loading? Open it directly →

Prefer to Talk First?

Call our team. We'll help you pick the right study.

Some properties are obvious yes-or-no calls. Some are complicated enough that the empty-lot study is the right move. An Account Manager or executive will tell you which.