Local Guides - Los Gatos

Building an ADU in Los Gatos: What to Expect

If you own a home in Los Gatos and you have already started picturing an ADU behind the main house or along the side yard, you are ahead of most homeowners we talk to. What usually stops people is not the idea, it is not knowing what happens between “we like this” and a finished home sitting on the lot. Here is the honest walkthrough, step by step, with real numbers.

Short version: Framework First builds your ADU almost entirely inside our Salinas factory, about 55 minutes from Los Gatos, then delivers the finished home by crane and sets it on your foundation. The process runs through 7 steps from the first look at your property to delivery day. Los Gatos has no published local ADU ordinance on file, so the California statewide rules apply to your project directly, and that generally works in your favor.

On this page

A finish that fits the neighborhood

Los Gatos homeowners expect a finish that matches the neighborhood, and that is exactly what we build toward. Our Urban Farmhouse and Ultra Modern styles were made for lots like these, with proportions and materials that read as though the ADU was always meant to be there. We have completed projects in Los Gatos already, so when we talk through setback lines, tree canopy, or how a new unit should sit next to an existing craftsman or a more contemporary main house, we are working from experience on the ground, not a guess from a satellite photo.

The 7 steps, localized for your lot

1. Property Analysis. We start with your address, lot dimensions, and goals, whether that is a rental, space for family, or a home office with a bathroom, and get a first read on what will fit.

2. Factory Tour. You come see where your ADU actually gets built. The Salinas factory is about 55 minutes from Los Gatos, an easy trip to walk the floor and see why building indoors under one roof produces a tighter, more consistent home than a typical site build.

3. Site Visit. Our team walks your property in person, checking crane access, utility connections, grading, and anything specific to your lot that a desk review would miss.

4. Feasibility Study. The formal go or no go step. It runs $497 for a standard lot or $997 if the lot is empty with no existing structures to reference. The fee credits toward your build once you move forward, and it is refundable only if your property genuinely cannot host an ADU.

5. Review Findings. We walk through what the feasibility study turned up: what size and configuration fit, what utility work is needed, and what a realistic budget and timeline look like for your lot.

6. Confirm Customizations. You lock in the model, layout, and finishes. Since Los Gatos has no local size cap on file, the statewide rules govern directly, meaning most of our roster is on the table depending on your lot size and setback distances.

7. Build and Deliver. Your home is built in the factory while site work happens in parallel, then delivered by crane and set. Timelines run from about 4 months for our smallest model up to 7 to 9 months for our largest.

What the statewide rules mean for you

Because Los Gatos has no published local ADU standard, the California statewide baseline applies directly to your project instead of a city-specific overlay. In practice that means a detached ADU can reach up to 1,200 square feet, and every jurisdiction, Los Gatos included, has to allow at least an 800 square foot, 16 foot tall unit with 4 foot side and rear setbacks no matter what. Height can reach 18 feet within a half mile walk of a major transit stop, plus 2 more feet to match your main home’s roof pitch. Review is ministerial, meaning no public hearing, and the city must act within 60 days of a complete application. Owner occupancy is not required. Parking is capped at one space and waived entirely for most lots near transit, for garage conversions, and for other common exemptions. Impact fees are waived completely under 750 square feet and prorated above that. A single-family lot can generally add one ADU plus one JADU up to 500 square feet built into the existing home.

Two ways this plays out on a Los Gatos lot

A homeowner with a standard side yard and rental income in mind often lands on something like the Six Sixty 2BR, 660 square feet, 2 bedroom, 1 bath, for $339,000 and about 5 months to deliver. As a planning estimate only, not a guarantee, a 2 bedroom unit renting at roughly $2,950 a month, after 5 percent vacancy, 8 percent maintenance, 1.25 percent property tax and 0.5 percent insurance on the build cost, pencils out as a real cash flow line, not just added equity. A family planning space for aging parents or adult kids tends to look at something roomier, like the Nine Forty-Five 3/2, 945 square feet, 3 bedroom, 2 bath, for $479,000 and about 6 months, comfortably clearing the guaranteed statewide minimum with room for a real kitchen and separate living area.

Financing, plainly

The $1,000 signup deposit is refundable if your financing falls through. The feasibility study fee, $497 or $997 for an empty lot, credits toward your build and is refundable only if your property cannot host an ADU. Most Los Gatos homeowners finance with a HELOC, a cash-out refinance, or a construction loan against home equity. We do not lend directly. For the mechanics, see How to Finance an ADU in California, HELOC vs Construction Loan for an ADU, and ADU Loans California.

Frequently asked questions

How long does the whole process take from first call to delivery?

It depends on the model. Our smallest unit delivers in about 4 months, mid-size two and three bedroom models typically run 5 to 6 months, and our largest model runs 7 to 9 months. For a full breakdown by phase, see ADU timeline in Los Gatos.

Does Los Gatos have its own ADU rules I need to worry about?

Not on file. There is no published local ADU ordinance for Los Gatos, so the California statewide baseline applies directly rather than a stricter city overlay. That includes the guaranteed 800 square foot minimum, ministerial approval within 60 days, and the parking exemptions most lots qualify for.

Can I sell my ADU separately from my main home someday?

California law allows a city to opt in and permit an ADU to be mapped as a condominium and sold separately from the main home under AB 1033. Whether that applies here depends on local participation, so it is worth asking our team directly when we walk your property.

What does the feasibility study actually check?

It confirms whether your lot can physically and legally host an ADU, factoring in setbacks, access, utilities, and site conditions before you commit to a build. It costs $497 for a standard lot or $997 for an empty lot, and the fee credits toward your build.

Ready to see what fits your lot

If you are ready to find out what your Los Gatos property can support, the next step is simple: start with a Property Analysis and we will tell you honestly what fits, what it costs, and how long it takes. For the permit side, read ADU permits in Los Gatos, and for a full pricing breakdown by model, see How Much Does an ADU Cost in Los Gatos.

More on building here: ADUs in Los Gatos · Santa Clara County ADU regulations

Form not loading? Open it directly →

Talk to a Real Person

Have a question this didn't answer?

Tell us a bit about your property below, and one of our Account Managers will follow up with a straight answer, not a form letter. Or call (831) 432-7721 directly.

  • A shortlist of models worth exploring for your goals
  • Honest flags on anything property-specific, like slope or septic
  • A clear next step, whether that is a factory tour or a feasibility study
  • No pressure, and no obligation

Building more than one? If you're a real estate developer or investor planning multiple units, let us know in the form. We offer better pricing at volume.

“My first telephone conversation with Cathy (Owner) was one of the best, positive and kind discussions. She was thinking outside of the box and provided a possible solution like a family member. Thank you.”

Vijay

on Google

Book my property analysisFree and online, about 30 minutes
Start