ADU Pricing · 2026

ADU Cost in California (2026): Prices From $199K to $599K

The Six Sixty Duo, a two bedroom ADU by Framework First

An ADU in California costs $199,000 to $599,000 with Framework First in 2026: $199,000 for a studio, $239,000 to $309,000 for a 1-bedroom, $339,000 to $449,000 for a 2-bedroom and $445,000 to $599,000 for a 3-bedroom. Each price includes a permitting budget, plans, foundation, delivery, utility hookups and appliances, with permit fees and site work confirmed in your feasibility study.

The short version: Our 14 models run from the 450 sq ft Four Fifty at $199,000 to the 1,200 sq ft Twelve Hundred U at $599,000, and add-ons can take a home above its listed price. The listed price covers the standard project scope, from a permitting budget and plans to delivery and appliances, not just the structure. What changes from lot to lot is your city’s permit fees and the work your property needs.

On this page

ADU cost by size

Bedroom count is the biggest driver of what you will spend. Here is where each size lands in 2026, with a deeper cost guide for each one.

SizeOur modelsSquare feetAll-inclusive price*Cost guide
StudioFour Fifty450$199,000Studio ADU cost
1 bedroomThe 405, Five Five Five, Six Sixty405 to 660$239,000 to $309,0001-bedroom ADU cost
2 bedroomSix Sixty Duo, Seven Forty-Nine, Eight Eighty-Five Duo and Duo Plus, Nine Forty-Five Duo and Duo Plus660 to 945$339,000 to $449,0002-bedroom ADU cost
3 bedroomNine Forty-Five Trio and Trio Plus, Twelve Hundred, Twelve Hundred U945 to 1,200$445,000 to $599,000See the 3-bedroom models

*Includes a permitting budget, not final permit costs. Permits and property-specific site work (septic, retaining walls and similar) vary by property and are confirmed in your feasibility study.

Every model and price

If you already know roughly what you need, here is the full lineup, sorted by price. Each home has its floor plan on the models page, and the pricing page shows what is included side by side.

ModelSizeBed / BathAll-inclusive priceTimeline**
Four Fifty450 sq ftStudio / 1$199,0004 months
The 405405 sq ft1 / 1$239,0005 months
Five Five Five555 sq ft1 / 1$279,0005 months
Six Sixty660 sq ft1 / 1$309,0005 months
Six Sixty Duo660 sq ft2 / 1$339,0005 months
Seven Forty-Nine749 sq ft2 / 1$369,0005 to 6 months
Eight Eighty-Five Duo885 sq ft2 / 1$399,0006 months
Nine Forty-Five Duo945 sq ft2 / 1$419,0006 months
Eight Eighty-Five Duo Plus885 sq ft2 / 2$429,0006 months
Nine Forty-Five Trio945 sq ft3 / 1$445,0006 months
Nine Forty-Five Duo Plus945 sq ft2 / 2$449,0006 months
Nine Forty-Five Trio Plus945 sq ft3 / 2$479,0006 months
Twelve Hundred1,200 sq ft3 / 2$549,0007 to 9 months
Twelve Hundred U1,200 sq ft3 / 2$599,0007 to 9 months

**Timelines are our estimates and depend on how long your city’s permit review takes. Four months is our best case, for the Four Fifty studio.

What the price includes

When we quote a price, it covers the standard project scope, not a shell you finish on your own:

  • A permitting budget and plan sets, including the site plan and Title 24 energy compliance. Our team manages the city process, and your permit fees are confirmed for your address in the feasibility study.
  • Foundation work at your property
  • The home itself, about 97% built indoors at our Salinas factory, with custom cabinets and all finish work
  • Crane delivery and setting the home on its foundation
  • Utility hookups for water, sewer and electrical
  • Appliances, installed and ready to use
  • The entry and deck installation
  • Project management and status updates by text and email, from contract to move-in

Property-specific work like a septic upgrade or a retaining wall is not part of the listed model price. Our team can build it in-house as part of your contract, so you work with one team from start to finish.

When you compare quotes, check each one line by line for permits, foundation, utility hookups and appliances. Those are the items most often quoted separately and added later.

Fees you may pay, and the ones state law limits

Fees are where ADU budgets get confusing, because there are four separate buckets and California treats each one differently. The rules below come from the California Department of Housing and Community Development’s ADU Handbook (March 2026 update).

  • Building permit and plan check fees. These are set by your city or county building department, and every jurisdiction has its own schedule. That is why our price carries a permitting budget and your actual fees are confirmed in the feasibility study.
  • Impact fees. An ADU with 750 square feet of interior livable space or less is exempt from impact fees charged by local agencies, special districts and water corporations. Above 750 square feet, impact fees have to be charged in proportion to the ADU’s size compared with your main home. HCD’s example: a 1,000 sq ft ADU next to a 2,000 sq ft home could be charged 50% of the impact fee a new primary home on the same lot would pay.
  • School fees. School districts may, but do not have to, charge school impact fees on ADUs larger than 500 square feet of interior livable space. ADUs under 500 square feet are not subject to them. We cover how districts apply them in do ADUs pay school fees.
  • Utility connection fees and capacity charges. For a new detached ADU, these have to be proportionate to the burden the ADU adds, based on its square footage or drainage fixture units compared with your main home.

Here is how that plays out across our lineup. The Four Fifty and The 405 are listed under 500 square feet. The Five Five Five, both Six Sixty models and the Seven Forty-Nine are listed at 750 square feet or less, so they sit under the impact fee line, though school fees can apply. Our 885, 945 and 1,200 square foot homes are above 750, so proportional impact fees can apply too. Your feasibility study confirms how your city measures interior livable space and what each fee comes to for your address.

For the full breakdown, read ADU impact fees explained, or the local guides to Monterey County ADU fees, Santa Cruz County ADU fees, Santa Clara County ADU fees and San Benito County ADU fees.

What changes the total for your lot

Your model price is the same on any lot. What moves is the work your specific property needs:

  • Septic. If your home is on septic instead of city sewer, the system may need an upgrade or expansion to serve a second home.
  • Slope. A sloped lot can call for retaining walls or a taller foundation.
  • Long utility runs. The farther the ADU sits from your existing water, sewer and electrical lines, the more trenching it takes. Some homes also need an electrical panel or sewer line upgrade.
  • Crane access. Tight access or a long crane reach can add to the delivery work.
  • Design style and add-ons. Our Classic Craftsman finish is standard. Urban Farmhouse and Ultra Modern are upgrades, and add-ons can take a home above its listed price.

Each of these is checked in your feasibility study before you commit. The study is $497 for a standard property or $997 for an empty lot. If your property cannot host an ADU, you get a full refund minus payment processing fees, and if you sign with us within 90 days, the fee is credited toward your build.

Prefab vs site-built: time and cost certainty

A custom site-built ADU in California commonly takes 16 to 24 months. We build about 97% of each home indoors at our Salinas factory while your foundation is prepared, so the build itself is protected from the weather and our crew spends far less time at your property. Our Four Fifty studio can be finished in as little as 4 months, our other homes take 5 to 9 months, and every timeline depends on your city’s permit review. State law requires the permitting agency to approve or deny a complete ADU application within 60 days when there is already a home on the lot, according to the HCD ADU Handbook.

The bigger advantage is knowing your total early. Your selections are locked in once your design is finalized, and the property-specific costs are identified up front in the feasibility study. We go deeper in prefab vs. site-built ADUs, and our guide to prefab ADUs in California explains how a factory-built home is made, inspected and delivered.

Thinking about converting a garage instead? A conversion is a different project with its own trade-offs, which we lay out in garage conversion to ADU. If you would rather replace a detached garage with a new ADU, state law requires your city to review the garage demolition permit at the same time as the ADU permit.

ADU cost by city

Our model prices are the same in every city we serve across Monterey, Santa Cruz, San Benito and Santa Clara counties, with San Luis Obispo County considered case by case. What differs from city to city is local permit fees, utility rules and site conditions, and each city guide covers those:

Paying for it

Most families finance an ADU against the equity in the home they already own, through a HELOC, a cash-out refinance, a renovation loan or a construction loan. We walk through each path in how to finance an ADU in California, and the financing page and ROI calculator let you model a payment, rental income and equity for any of our homes.

If you plan to rent the ADU, how much rent an ADU can earn in California and average ADU ROI in California cover the income side. Once it is finished, the ADU also adds to your property tax bill, but only on its own value, not your whole home’s, which we explain in does an ADU increase property taxes in California.

Frequently asked questions

How much does an ADU cost in California?

With Framework First, a finished ADU costs $199,000 to $599,000 in 2026 before add-ons, depending on size and layout. That price includes a permitting budget, plans, foundation, the factory build, delivery, utility hookups and appliances. Your permit fees and any property-specific site work are confirmed in your feasibility study.

What is the cheapest ADU I can build?

Our most affordable home is the Four Fifty, a 450 sq ft studio at $199,000. It is also our fastest build, finished in as little as 4 months depending on permitting, and at 450 square feet it sits under both state fee thresholds: no impact fees at 750 square feet or less, and no school fees under 500 square feet. If you want a separate bedroom, The 405 is our lowest-priced 1-bedroom at $239,000. For other ways to bring the cost down, see the cheapest way to build an ADU.

How much does a 1-bedroom ADU cost?

Our 1-bedroom homes cost $239,000 to $309,000: The 405 at $239,000, the Five Five Five at $279,000 and the Six Sixty, the home we build most, at $309,000. All three are listed at 750 square feet or less, so they fall under the state’s impact fee exemption, which is measured by interior livable space. The Five Five Five and Six Sixty are over 500 square feet, so your school district can still charge school fees on them. Our 1-bedroom ADU cost guide compares them in detail.

How much does a 2-bedroom ADU cost?

Our 2-bedroom homes cost $339,000 to $449,000 across six models. The Six Sixty Duo is the most affordable at $339,000 and fits two bedrooms into the same 660 sq ft footprint as our most popular home. The Nine Forty-Five Duo Plus, with two bathrooms, tops the range at $449,000. See the 2-bedroom ADU cost guide for every layout.

Are permits included in the price?

Every price includes a permitting budget, and our team handles the city permit process for you. The permit fees themselves are set by your city or county, so we confirm them for your address in the feasibility study, once we have looked at your lot.

Do ADUs pay impact fees in California?

Not if the ADU has 750 square feet of interior livable space or less. Above 750 square feet, impact fees must be proportional to the ADU’s size compared with your main home. School districts may separately charge school fees on ADUs larger than 500 square feet. These rules are summarized in the state’s ADU Handbook, and your feasibility study confirms what applies to your address.

What can change the price after I sign?

Your selections are locked in. Your model price, your add-ons and any promotion you qualify for are held for you. The parts that can shift are permit fees and property-specific site work, because they depend on your city’s requirements and what your lot needs. That is why the feasibility study looks at both before you commit.


Want to see what an ADU would take on your property? See if your lot qualifies and our team will confirm the permit fees and site work for your address before you commit. You can also design and price a home any time in The ADU Designer by Framework First, with no sign-up needed. Not ready for a study yet? Start with a free Online Property Analysis and our team will tell you whether an ADU makes sense for your lot.

Next Step · Pricing

14 models, 199K to 599K all-inclusive →

Every model with its price and size, from permits to appliances.

Form not loading? Open it directly →

Talk to a Real Person

Have a question this didn't answer?

Tell us a bit about your property below, and one of our Account Managers will follow up with a straight answer, not a form letter. Or call (831) 432-7721 directly.

  • A shortlist of which models actually fit your lot
  • Honest flags on anything property-specific, like slope or septic
  • A clear next step, whether that is a factory tour or a feasibility study
  • No pressure, and no obligation

Building more than one? If you're a real estate developer or investor planning multiple units, let us know in the form. We offer better pricing at volume.

“My first telephone conversation with Cathy (Owner) was one of the best, positive and kind discussions. She was thinking outside of the box and provided a possible solution like a family member. Thank you.”

Vijay Kumar

on Google

See If My Property QualifiesFree property analysis
Start