Local Guides - Marina
Building an ADU in Marina: What to Expect

The short version: we build every home in our Salinas factory, about 20 minutes from Marina, then crane it onto your lot mostly finished. You go through the same 7-step process every Framework First client goes through: Property Analysis, Factory Tour, Site Visit, Feasibility Study, Review Findings, Confirm Customizations, and Build and Deliver. We’ve already completed 4 ADU projects for Marina homeowners, including a rental unit for a client named Cindy Lou, and Marina doesn’t have its own local ADU ordinance on file, so California’s statewide rules apply directly to your project.
On this page
If you’re picturing what it’s actually looks like to build an ADU in Marina with Framework First, this is that walk-through. Twenty minutes from our factory, Marina is prime ADU territory for us, and one of our favorite client stories comes from right here: Cindy Lou’s rental property. Here’s what the process looks like from first call to move-in day.
Serving Marina from 20 minutes away
We serve Marina from our Salinas factory, 20 minutes away, and we’ve already completed 4 ADU projects for homeowners here. Because your ADU is built indoors on a factory line rather than stick-built on your lot from scratch, weather delays, subcontractor scheduling gaps, and the usual jobsite slowdowns that stretch out traditional construction mostly don’t apply. The home travels to Marina largely finished, then our crew completes the connections on site.
Step 1: Property Analysis
Before anything else, we take a close look at your lot: size, shape, access, setbacks, slope, and what utilities already run to the property. Because Marina hasn’t published its own local ADU standard, we’re working from California’s statewide baseline the whole way through, which actually simplifies things. State law guarantees every property in California can host at least an 800 square foot, 16 foot tall ADU with 4 foot side and rear setbacks, regardless of what a city’s local zoning might otherwise say. From there, detached ADUs can go up to 1,200 square feet under state law, and cities aren’t allowed to cap that lower than 850 square feet for a studio or 1 bedroom, or 1,000 square feet for a 2 bedroom or larger unit. This gives us a clear starting point for sizing your project before we ever set foot on the lot.
Step 2: Factory Tour
Many Marina homeowners haven’t seen a home built this way before, so we invite you to the Salinas factory to walk the line in person. You’ll see units at every stage, framing, electrical rough-in, cabinetry, final finish work, so you can picture what your own model will look like as it comes together. It’s a short 20 minute drive from Marina, and it tends to be the point where the process stops feeling abstract and starts feeling real. It’s the same factory where Cindy Lou, a Marina client who built her Six Sixty with us as a rental, saw the construction quality firsthand: “I could tell that it was made very well. Everything looks top of the line, the fixtures, the windows, the kitchen. It’s awesome.”
Step 3: Site Visit
Next, our team comes to you. We walk your property in Marina to confirm access for delivery and crane placement, check where utility connections will land, and talk through where the ADU makes the most sense on your lot. Parking is rarely a sticking point at this stage: state law caps ADU parking requirements at one space, and most lots qualify for an exemption entirely, including properties within a half mile walk of transit, situations where the ADU replaces a garage, and most conversions.
Step 4: Feasibility Study
This is where we put real numbers behind your specific property. The feasibility study runs $497, or $997 if your lot is currently empty, and that fee credits toward your build. It’s only refundable in the rare case your property truly can’t host an ADU. This step tells you what will actually fit, what utility work is involved, and what the honest cost and timeline look like for your Marina address.
Step 5: Review Findings
We sit down with you and go through the feasibility results line by line: buildable footprint, model options that fit your lot, budget, and realistic timeline. Because approval of a standard ADU in California is ministerial, meaning it’s approved or denied without a public hearing and the jurisdiction must act within 60 days of a complete application, you’re not staring down months of uncertainty waiting on a planning commission. You also don’t need to live on the property yourself. Owner occupancy isn’t required for a standard ADU anywhere in California, and cities can’t impose it.
Step 6: Confirm Customizations
Once you’ve picked a direction, we lock in your model and finishes. Framework First builds 14 models, from the 450 square foot Four Fifty studio at $199,000 through the 1,200 square foot Twelve Hundred at $549,000 or the upgraded Twelve Hundred U at $599,000. Every price includes a permitting budget along with plans through appliances, and your exact permit costs get confirmed in the feasibility study. Cindy chose our Six Sixty, a 660 square foot 1 bedroom model priced at $309,000, sized specifically for her rental plans. Six of our models, the Four Fifty, The 405, Five Five Five, Six Sixty, Six Sixty 2BR, and Seven Forty-Nine, stay under 750 square feet, which means they skip local impact fees entirely under state law. Larger models still benefit from the state rule that fees must scale proportionally to the size of your main home rather than being charged at a flat rate.
Step 7: Build and Deliver
Your home is built in our Salinas factory while site work happens in parallel in Marina: foundation, utility stub-outs, and any prep the site visit flagged. When the home is ready, it travels the 20 minutes from Salinas and gets craned onto your lot, then our crew completes final hookups and finishes.
What this means for rental or family use
If you’re weighing the ADU as a rental, like Cindy did, our planning estimates use rent benchmarks of about $2,000 a month for a studio, $2,500 for a 1 bedroom, $2,950 for a 2 bedroom, and $3,450 for a 3 bedroom, with a net cash flow model built on 5% vacancy, 8% maintenance, 1.25% annual property tax, and 0.5% annual insurance as a share of ADU cost. These are planning estimates, not guarantees, but they’re useful for sizing up whether a rental unit pencils out on your Marina lot. For financing, the $1,000 signup deposit is refundable if financing falls through, and most homeowners fund their build through a HELOC, cash-out refinance, or construction loan against home equity. We don’t lend directly. You can read more in How to Finance an ADU in California, HELOC vs Construction Loan for an ADU, and ADU financing in Marina.
For the permit and timeline detail specific to Marina, see ADU Permits in Marina and ADU Timeline in Marina. If you’re still working out budget, How Much Does an ADU Cost in Marina breaks down pricing by model, and ADU Setbacks in Marina covers exactly what fits on your lot.
Frequently asked questions
Has Framework First built an ADU in Marina before?
Yes. We’ve completed 4 ADU projects for Marina homeowners, including a rental unit built by Cindy Lou using our Six Sixty model. Our factory is 20 minutes from Marina, and we use the same 7-step process for every client, whether it’s their first ADU on the street or their fourth.
Does Marina have its own ADU rules I need to worry about?
Marina doesn’t currently have a published local ADU standard on file, so California’s statewide ADU law applies directly to your project. That includes the state’s guaranteed minimum 800 square foot, 16 foot ADU allowance, ministerial approval within 60 days, and the parking exemptions most lots qualify for.
Can I add a Junior ADU instead of, or in addition to, a full ADU?
Yes. A Junior ADU is a unit up to 500 square feet built within the existing walls of a single family home, and a JADU only requires owner occupancy if it shares a bathroom with the main house. A single family lot in Marina can generally add one full ADU plus one JADU.
Can I sell my ADU separately from my main home someday?
In jurisdictions that opt in, state law under AB 1033 allows an ADU to be mapped as a condominium and sold separately from the primary residence. Whether that’s available in Marina depends on local opt-in status, so it’s worth asking us directly when we go through your Property Analysis.
Ready to see what fits your Marina lot
The best next step is the Property Analysis, a free look at what your specific lot can support before you spend anything. From there, a Factory Tour lets you see exactly how these homes get built, and where Cindy’s rental unit came together, before you commit to a model. Reach out and we’ll get your Marina property on the calendar.
Free Tool
Marina ADU rules lookup →
Answer a few questions and get the ADU rules for your Marina property, cited to official sources.
Free Tool
Free Marina property report →
Type your address and see your lot, what fits on it, and the local rules in one report.
More on building here: ADUs in Marina · Monterey County ADU regulations




