Local Guides - Marina
How Much Does an ADU Cost in Marina?

If you’re pricing out an ADU in Marina, here’s the number that actually matters: Framework First’s 14 models run from $199,000 to $599,000, and most Marina homeowners land somewhere in the middle once they’ve settled on a bedroom count and finish level. That price has a permitting budget built in alongside architectural plans, the foundation, the full factory build, crane delivery, every utility hookup, appliances, and final inspections, so it isn’t a stripped-down bid that grows once real work starts. Your exact permit costs are set by the city and confirmed for your address in the feasibility study, and property-specific site work like a septic upgrade or retaining wall is handled in-house under your contract instead of showing up as a separate bill later.
The short version: Marina ADUs through Framework First run $199,000 to $599,000 fully built, delivered in 4 to 9 months depending on size. We’ve already completed 4 ADU projects for Marina homeowners from our factory 20 minutes away in Salinas, so this is familiar ground for us, not a new market. Price moves with size, bedroom count, and finish level, never a rate multiplied against square footage.
On this page
What Marina ADUs actually cost, by model
| Model | Size | Beds/Baths | All-inclusive price* | Build time |
|---|---|---|---|---|
| Four Fifty | 450 sq ft | Studio/1ba | $199,000 | 4 months |
| The 405 | 405 sq ft | 1bd/1ba | $239,000 | 5 months |
| Five Five Five | 555 sq ft | 1bd/1ba | $279,000 | 5 months |
| Six Sixty | 660 sq ft | 1bd/1ba | $309,000 | 5 months |
| Six Sixty 2BR | 660 sq ft | 2bd/1ba | $339,000 | 5 months |
| Seven Forty-Nine | 749 sq ft | 2bd/2ba | $369,000 | 5 to 6 months |
| Eight Eighty-Five 2BR | 885 sq ft | 2bd/1ba | $399,000 | 6 months |
| Nine Forty-Five 2/1 | 945 sq ft | 2bd/1ba | $419,000 | 6 months |
| Nine Forty-Five 3/1 | 945 sq ft | 3bd/1ba | $445,000 | 6 months |
| Eight Eighty-Five 2/2 | 885 sq ft | 2bd/2ba | $429,000 | 6 months |
| Nine Forty-Five 2/2 | 945 sq ft | 2bd/2ba | $449,000 | 6 months |
| Nine Forty-Five 3/2 | 945 sq ft | 3bd/2ba | $479,000 | 6 months |
| Twelve Hundred | 1,200 sq ft | 3bd/2ba | $549,000 | 7 to 9 months |
| Twelve Hundred U | 1,200 sq ft | 3bd/2ba | $599,000 | 7 to 9 months |
*Includes a permitting budget, not final permit costs. Permits and property-specific site work (septic, retaining walls, etc.) vary by property and are confirmed in your feasibility study.
That’s the complete lineup, all 14 models. With that much range, there’s almost always a size and layout that fits your lot and your budget, without forcing you to over-build for the space you have or squeeze a growing family into something too small.
What actually moves the price inside that range
Size drives more of the number than anything else. A 450 square foot studio and a 1,200 square foot three-bedroom home represent genuinely different amounts of foundation, framing, and finish work from start to finish, and the price spread across our lineup reflects that directly rather than any hidden markup.
Bedroom and bathroom count is the second lever. Two homes with a similar footprint can land at different prices depending on whether you’re building one bathroom or two, since plumbing runs, fixture counts, and layout complexity all shift with it.
Finish level is the third. Cabinetry, countertops, flooring, and fixture packages all carry a range, and where your project lands inside that range moves your final number without changing the model’s footprint or floor plan.
Marina’s rules shape your project, and your cost
Marina doesn’t have a published local ADU standard on file with us, so California’s statewide rules govern your project directly rather than a local layer stacked on top of them. That means every lot in Marina is guaranteed at least an 800 square foot, 16 foot tall ADU with 4 foot side and rear setbacks no matter what, detached ADUs can reach up to 1,200 square feet under state law, and the city can’t cap that lower than 850 square feet for a studio or one-bedroom, or 1,000 square feet for a two-bedroom or larger unit. Approval is ministerial too: the city has to approve or deny a complete application within 60 days, with no public hearing standing between you and a permit.
That size threshold matters for your wallet in one specific way. Six of our models, the Four Fifty, The 405, Five Five Five, Six Sixty, Six Sixty 2BR, and Seven Forty-Nine, stay under 750 square feet and skip local impact fees entirely. Cross 750 square feet and fees still apply, but they scale proportionally to the size of your main home rather than landing as a flat penalty.
We’ve already completed 4 ADU projects for Marina homeowners, and our factory sits just 20 minutes away in Salinas, so site visits, delivery logistics, and permit coordination here aren’t a guessing game for our team. For the full step-by-step approval process, see ADU permits in Marina, and for a realistic month-by-month build schedule, see ADU timeline in Marina.
Financing an ADU in Marina
Most homeowners don’t write one check for the full amount. A $1,000 signup deposit gets your project started and is refundable if financing falls through. Your feasibility study, $497 standard or $997 for an empty lot, credits toward your final build cost and is refundable only if your property turns out unable to host an ADU. From there, homeowners commonly use a HELOC, a cash-out refinance, or a construction loan against their home’s equity. We don’t lend directly, but we’ll walk you through how each option typically works. For more detail, read How to Finance an ADU in California, HELOC vs Construction Loan for an ADU, and ADU Loans California, or see our full breakdown in ADU financing in Marina.
Get an exact number for your lot
Every number above is a starting point, not your final quote. Your actual price depends on your lot size, what’s already on the property, and how far utilities have to travel to reach your ADU. The fastest way to get a real number is our free Property Report, or run our Online Property Analysis yourself to see what fits your lot before you talk to anyone.
Frequently asked questions
What’s the cheapest ADU I can build in Marina?
Our most affordable model is the Four Fifty, a 450 square foot studio at $199,000 all-inclusive. It also stays under the 750 square foot threshold, so it skips local impact fees entirely, which keeps the true out-the-door number close to the sticker price.
Does the price include my permits?
It includes a permitting budget, not your final permit bill. Actual permit costs are set by the city, vary by property, and are confirmed as part of your feasibility study, so you know your real number before you sign a build contract.
How long does a Marina ADU take to build?
Most of our homes take 4 to 9 months from start to finish depending on size. Because roughly 97% of the build happens in our factory while permitting and site prep move in parallel, the schedule tends to be more predictable than a traditional stick-built project. See ADU timeline in Marina for the full week-by-week breakdown.
Can an ADU in Marina generate rental income?
Yes, and it’s one of the most common reasons Marina homeowners build with us. Using our sitewide rent benchmarks, a one-bedroom unit like our Six Sixty rents for roughly $2,500 a month. See ADU rental income in Marina for real net cash flow numbers, including a look at how one Marina client’s rental unit is performing.
Ready to see what an ADU actually costs on your Marina lot? Contact us and we’ll walk through your property, your budget, and which of our 14 models makes sense for your family. If setbacks and buildable area are on your mind first, our ADU setbacks in Marina guide is the place to start.
Free Tool
Marina ADU rules lookup →
Answer a few questions and get the ADU rules for your Marina property, cited to official sources.
Free Tool
Free Marina property report →
Type your address and see your lot, what fits on it, and the local rules in one report.
More on building here: ADUs in Marina · Monterey County ADU regulations




