How Much Does an ADU Cost in Los Altos?

If you’re pricing out an ADU in Los Altos, here’s the honest number: Framework First’s 14 models run from $199,000 to $599,000, all-inclusive of design, a permitting budget, factory construction, crane delivery, foundation, utility hookups, appliances, and final inspections. On Los Altos’s larger lots, that quarter-acre and up is common, most homeowners end up choosing from the upper half of that range, because there’s actual room for a full two- or three-bedroom home instead of squeezing a studio into a side yard. We’ve completed 3 ADU projects for Los Altos homeowners, so this isn’t a guess about what fits here, it’s a number we’ve already built to more than once.
The short version: Los Altos ADUs through Framework First run $199,000 to $599,000 fully built, delivered in 4 to 9 months depending on size. The price moves with square footage, bedroom count, and finish level, never a per-square-foot rate tacked on after the fact. A free Property Report or Online Property Analysis gets you an exact number for your specific lot.
On this page
What Los Altos ADUs actually cost, by model
| Model | Size | Beds/Baths | Price | Timeline |
|---|---|---|---|---|
| Four Fifty | 450 sq ft | Studio/1 | $199,000 | 4 months |
| The 405 | 405 sq ft | 1/1 | $239,000 | 5 months |
| Five Five Five | 555 sq ft | 1/1 | $279,000 | 5 months |
| Six Sixty | 660 sq ft | 1/1 | $309,000 | 5 months |
| Six Sixty 2BR | 660 sq ft | 2/1 | $339,000 | 5 months |
| Seven Forty-Nine | 749 sq ft | 2/2 | $369,000 | 5 to 6 months |
| Eight Eighty-Five 2BR | 885 sq ft | 2/1 | $399,000 | 6 months |
| Nine Forty-Five 2/1 | 945 sq ft | 2/1 | $419,000 | 6 months |
| Nine Forty-Five 3/1 | 945 sq ft | 3/1 | $445,000 | 6 months |
| Eight Eighty-Five 2/2 | 885 sq ft | 2/2 | $429,000 | 6 months |
| Nine Forty-Five 2/2 | 945 sq ft | 2/2 | $449,000 | 6 months |
| Nine Forty-Five 3/2 | 945 sq ft | 3/2 | $479,000 | 6 months |
| Twelve Hundred | 1,200 sq ft | 3/2 | $549,000 | 7 to 9 months |
| Twelve Hundred U | 1,200 sq ft | 3/2 | $599,000 | 7 to 9 months |
*Includes a permitting budget, not final permit costs. Permits and property-specific site work (septic, retaining walls, etc.) vary by property and are confirmed in your feasibility study.
Los Altos families tend to gravitate toward our larger two- and three-bedroom homes, the kind that can genuinely house a parent or an adult child rather than just add a home office. That said, all 14 models are built and delivered the same way, so a smaller unit for rental income or a compact guest space is just as buildable on a Los Altos lot.
What actually moves the price inside that range
Three things change your number, and none of them is a rate multiplied against square footage. Size is the biggest lever, going from our 450 square foot Four Fifty to the 1,200 square foot Twelve Hundred roughly triples the price, because you’re paying for materials, appliances, and finish square footage, not a formula. Bedroom and bathroom count matters next: a second bathroom adds plumbing, fixtures, and code requirements that a single-bath layout doesn’t carry, which is why the two Nine Forty-Five models at the same 945 square feet land at different prices depending on bath count. Finish level is the third lever, and on Los Altos projects it’s often where families spend the most time deciding, since a unit built for aging parents or a permanent family member usually gets a different finish package than a straightforward rental.
Los Altos’s own rules shape your project, and your cost
Los Altos doesn’t have a published local ADU standard on file, so California’s statewide ADU rules apply directly to your lot, and that statewide baseline is more generous than most homeowners expect. Every property in the state, Los Altos included, is guaranteed the right to build at least an 800 square foot, 16 foot tall ADU with 4 foot side and rear setbacks, no matter what a city might otherwise want. Detached ADUs can go up to 1,200 square feet, and a city can’t set its own cap lower than 850 square feet for a studio or one-bedroom, or 1,000 square feet for a two-bedroom or larger. On Los Altos’s typically large parcels, that ceiling is usually the realistic target rather than an aspirational one, unlike smaller-lot cities where setbacks eat into the buildable envelope before you ever hit the size cap.
Cost-wise, the number that matters most is 750 square feet: any of our six models under that threshold, the Four Fifty through the Seven Forty-Nine, skip local impact fees entirely under state law. Above 750 square feet, fees still apply but must scale proportionally to your primary home, not as a flat penalty. Because Los Altos reviews ADU applications ministerially, meaning no public hearing and a decision required within 60 days of a complete application, the fee and approval picture stays predictable rather than turning into a drawn-out negotiation.
Financing an ADU in Los Altos
Getting started costs a $1,000 signup deposit, refundable if your financing falls through, and a feasibility study fee of $497 for a standard lot or $997 for an empty lot, which credits 100% toward your build contract if you sign within 90 days and is refundable only if your property is found unable to host an ADU. Framework First doesn’t lend directly, but most Los Altos homeowners finance their ADU with a HELOC, a cash-out refinance, or a construction loan against their home’s equity. For the deeper breakdown specific to this city, see our Los Altos ADU financing guide, and for the statewide picture, How to Finance an ADU in California, HELOC vs Construction Loan for an ADU, and ADU Loans California.
Get an exact number for your lot
The prices above are real, with a permitting budget already built in, but the only way to know your true out-the-door cost is to look at your specific lot, its access, utilities, setbacks, and exactly how much of that 1,200 square foot ceiling you can actually use. Start with a free Property Report or book an Online Property Analysis and we’ll map what your Los Altos lot supports.
Frequently asked questions
What’s the cheapest ADU I can build in Los Altos?
Our Four Fifty studio at $199,000 all-inclusive is the most affordable model in the lineup, a bright 450 square foot studio with a permitting budget already built in. It’s a less common pick in Los Altos, where families more often lean toward larger layouts, but it’s fully buildable on any qualifying lot.
Does the price actually include my permits?
It includes a permitting budget, which covers the design and process work of getting your ADU permitted. Your exact permit fees are set by Los Altos and confirmed for your specific address in the feasibility study, not guessed at up front or billed separately after the fact.
How long does a Los Altos ADU take to build?
Most Framework First homes are finished in 4 to 9 months depending on the model, with smaller units on the faster end and the 1,200 square foot models running 7 to 9 months. Our Los Altos ADU timeline guide breaks the schedule down week by week.
Can a Los Altos ADU realistically pay for itself with rent?
For many owners, yes. See our Los Altos rental income guide for real rent benchmarks and a net cash flow breakdown by model, and run your own numbers in the ADU ROI Calculator.
Ready to see what fits your lot
Every Los Altos property is a little different, and the fastest way to find your real number is to start with a free property analysis. Contact us or browse the full models lineup and pricing to see what’s possible on your lot.
Free Tool
Los Altos ADU rules lookup →
Answer a few questions and get the ADU rules for your Los Altos property, cited to official sources.
Free Tool
Free Los Altos property report →
Type your address and see your lot, what fits on it, and the local rules in one report.
More on building here: ADUs in Los Altos · Santa Clara County ADU regulations