Local Guides - Morgan Hill
How Much Does an ADU Cost in Morgan Hill?
If you’re pricing out an ADU in Morgan Hill, here’s the real number: our homes run from $199,000 to $599,000, with a permitting budget built into every price. That price covers engineered plans, foundation work, the factory build itself, delivery, utility hookups, appliances and final inspections. Permit costs themselves are set by the city, so your exact figure gets confirmed for your address in the feasibility study, and property-specific work like a septic upgrade or retaining wall sits outside the listed model price, though we build it in-house under your contract so the whole project stays with one builder. Most Morgan Hill homeowners we work with, especially the multigenerational families who need real bedrooms for grandparents or grown kids, land somewhere in the $300,000 to $450,000 range for a two or three bedroom home. Where you fall in that range comes down to size, bedroom count and finish level, not some formula tied to square footage alone. The only way to get an exact number for your specific lot is a free Property Report or our Online Property Analysis, both of which look at your actual site instead of a citywide average.
On this page
What our models cost
Here’s a representative slice of the lineup, from smallest to largest:
| Model | Size | Bed/Bath | All-Inclusive Price* | Build Time |
|---|---|---|---|---|
| Four Fifty | 450 sq ft | Studio/1 bath | $199,000 | 4 months |
| Six Sixty 2BR | 660 sq ft | 2 bed/1 bath | $339,000 | 5 months |
| Seven Forty-Nine | 749 sq ft | 2 bed/1 bath | $369,000 | 5 to 6 months |
| Eight Eighty-Five 2/2 | 885 sq ft | 2 bed/2 bath | $429,000 | 6 months |
| Nine Forty-Five 3/2 | 945 sq ft | 3 bed/2 bath | $479,000 | 6 months |
| Twelve Hundred | 1200 sq ft | 3 bed/2 bath | $549,000 | 7 to 9 months |
*Includes a permitting budget, not final permit costs. Permits and property-specific site work (septic, retaining walls, etc.) vary by property and are confirmed in your feasibility study.
We build 14 models total, so if none of these six is the shape you need, there’s likely a size and layout between them (or above them, up to the $599,000 top of the lineup) that fits.
What actually drives the price
Three things move a project up or down within that range. Size is the obvious one: more square footage means more materials, more factory labor and a longer build. Bedroom count matters almost as much, since a two bedroom and a three bedroom at a similar footprint carry different plumbing, framing and finish needs. Finish level is the third lever. Every model ships complete with real appliances and finishes, but the specific choices you make inside that scope shift the final number. None of this is priced out by a rate per square foot. It’s priced by the actual home, which is exactly why the number changes from lot to lot and family to family.
Why Morgan Hill fits our bigger models well
Morgan Hill tends to have more room to work with than tighter urban lots elsewhere in Santa Clara County, and that shows up in what we build here. We’ve delivered two and three bedroom homes in Morgan Hill for multigenerational families who needed a parent, adult child or in-law to have a real, separate home on the same property rather than a converted room. If that’s your situation, the larger models in the table above (or something even bigger, up to the 1200 square foot Twelve Hundred) are worth a serious look before you assume a smaller unit is your only option.
We’re about 40 minutes from Morgan Hill out of our Salinas factory, and we’ve already completed projects in the area, so the delivery and site logistics here are familiar ground for our crews, not a first attempt.
How Morgan Hill’s rules affect your cost
Morgan Hill’s own development standards live in Municipal Code chapter 18.84, but on the rules that actually move your price, the city follows the statewide baseline set by California law. A few specifics worth knowing as you budget. Impact fees are waived entirely on any ADU under 750 square feet, which covers six of our models, including the Seven Forty-Nine in the table above. Every city, Morgan Hill included, has to allow at least an 800 square foot, 16 foot tall ADU regardless of local preference, so a reasonably sized home is never something you have to fight for. And Morgan Hill’s local rules allow a single-family lot to add a Junior ADU, an attached or internal conversion, and a detached ADU, which opens up phased or multi-unit planning if that’s useful for your property and your budget.
For the full approval process and how long it typically takes, see our posts on ADU permits in Morgan Hill and ADU timeline in Morgan Hill.
Paying for it
A $1,000 signup deposit gets your project moving, and it’s fully refundable if your financing falls through. Before that, most homeowners start with a feasibility study, $497 for a standard lot or $997 if the lot is empty, and that fee credits toward your build. It’s only refunded if your property genuinely can’t host an ADU. Most homeowners pay for construction with a HELOC, a cash-out refinance, or a construction loan against their home equity. We don’t lend directly, but we’ve laid out how those options compare in How to Finance an ADU in California, HELOC vs Construction Loan for an ADU, and ADU Loans California.
Frequently asked questions
What’s the average cost of an ADU in Morgan Hill?
Across our full lineup, prices run from $199,000 to $599,000, all inclusive. Most Morgan Hill families we work with land in the $300,000 to $450,000 range because they’re building a two or three bedroom home for a family member. Your exact number depends on the model, bedroom count and finish choices you land on.
Does my lot size change the price?
Lot size itself doesn’t set the price, but it does affect what fits. Morgan Hill’s larger lots often give homeowners room for our bigger family-size models, which is part of why we’ve built more two and three bedroom ADUs here. A free Property Report will tell you what your specific lot can actually support.
Are there hidden costs on top of the sticker price?
No hidden line items on our end. The price we quote includes a permitting budget, plans, foundation, the factory-built home, delivery, hookups, appliances and inspections, all in one number. What it doesn’t include is anything truly property-specific, like your exact permit fees (set by the city and confirmed in your feasibility study) or site work such as a septic upgrade, which we still handle in-house under your contract. That’s a deliberate difference from a lot of general contractors, where the initial bid often doesn’t include everything you’ll actually be billed for.
Can renting out my ADU help offset the cost?
It can. As a general planning estimate, not a guarantee, a two bedroom ADU in the area rents in the neighborhood of $2,950 a month and a three bedroom around $3,450, before accounting for vacancy, maintenance, taxes and insurance. Whether that pencils out for your specific home depends on your build cost and local rental conditions, so treat it as a starting point rather than a promise.
Get your exact number
Every Morgan Hill lot is a little different, and the fastest way to see where your project lands in that $199,000 to $599,000 range is to start with a free Property Report or our Online Property Analysis. From there, our team can walk you through models, financing and next steps for your specific property. Reach out here and we’ll get you real numbers, not a generic estimate.
Free Tool
Morgan Hill ADU rules lookup →
Answer a few questions and get the ADU rules for your Morgan Hill property, cited to official sources.
Free Tool
Free Morgan Hill property report →
Type your address and see your lot, what fits on it, and the local rules in one report.
More on building here: ADUs in Morgan Hill · Santa Clara County ADU regulations