ADU Pricing · 2026

How Much Does It Cost to Build a 400 Square Foot ADU? (2026)

In California, a new detached ADU of about 400 square feet usually costs roughly $150,000 to $250,000 finished, once you count the foundation, utility hookups, permits and appliances, not just the building. Our two smallest homes are the Four Fifty studio at $199,000 and The 405 one-bedroom at $239,000, all-inclusive with plans, a permitting budget, the foundation, crane delivery and utility hookups.

The short version: A 400 square foot ADU costs more per square foot than a bigger one, because every ADU needs the same kitchen, bathroom, foundation and utility runs no matter its size. It also skips two state fees: no local impact fees at 750 square feet or less, and no school fees under 500 square feet of interior living space. A garage conversion of the same size can cost less, because the shell already stands. A feasibility study confirms the real number for your lot.

On this page

What a 400 square foot ADU costs in 2026

Quotes you find online for a 400 square foot ADU swing from under $100,000 to well over $250,000. Most of that spread comes from what the quote leaves out. A price for the building alone looks low; a price for a finished, permitted home you can move into is the number that matters.

Here are our two homes in this size range. Both prices are all-inclusive.

ModelSizeLayoutAll-inclusive price*Typical timeline
The 405405 sq ft1 bed / 1 bath$239,000About 5 months
Four Fifty450 sq ftStudio / 1 bath$199,000About 4 months, best case

*Includes plans, a permitting budget, the foundation, the factory build, crane delivery, utility hookups, appliances, cabinets and final inspection. Permit fees are set by each city and county and confirmed in your feasibility study. Property-specific site work, such as a septic upgrade or a retaining wall, is priced separately in-house. Timelines are subject to local permitting.

You can see both homes, with floor plans and finish styles, on the models page.

Why small ADUs cost more per square foot

A 400 square foot home and a 900 square foot home both need one kitchen, at least one bathroom, a water heater, an electrical panel, a foundation, and trenches for water, sewer and power. Those parts cost about the same at either size. Spread over fewer square feet, they push the cost per square foot up.

That is why we never compare ADUs on price per square foot. The useful question is what a finished, livable home costs, and what it will do for you: rent, house family, or give you a quiet office.

Fees a 400 square foot ADU does not pay

California law gives small ADUs two real breaks, and a 400 square foot home gets both.

  • No local impact fees at 750 square feet or less. Under Government Code section 66311.5, a city, county or special district cannot charge impact fees on an ADU of 750 square feet of interior livable space or less. Above that, fees must be proportional to the size of your main house.
  • No school fees under 500 square feet. The same law, together with Education Code section 17620, exempts an ADU under 500 square feet of interior livable space from school district fees.

Utility connection fees are a separate line. They can still apply to a new detached ADU, though they must be proportional to the unit’s size or plumbing fixtures. A conversion inside an existing structure usually owes no new connection fee at all.

400 square foot detached ADU vs garage conversion

OptionWhy it can cost lessWhat to watch
Garage conversionThe walls, roof and slab already exist, and California no longer requires you to replace the lost parkingThe slab, framing and electrical often need upgrades to meet living-space code
Junior ADU (JADU) inside your homeUses rooms and utilities you already have; up to 500 square feetSmaller, shares a wall with your household, and owner-occupancy applies if it shares a bathroom
New detached 400 square foot ADUMost private, built new to current code, and the factory builds it while the site is preparedNew foundation and utility runs, so it costs the most of the three

We build new, detached, factory-built homes. If you have a sound garage you don’t need, a conversion may be your least expensive path. Our garage conversion guide and cheapest way to build an ADU walk through it honestly.

What can push the price up

  • A long utility run. The farther the ADU sits from your main sewer, water and power lines, the more trenching it needs.
  • Your sewer or septic. A septic system that cannot take another unit is the biggest surprise on rural Central Coast lots.
  • Slope, soil and access. A sloped yard may need a taller foundation or a retaining wall, and a crane has to be able to reach the pad.
  • Your city’s fees. Plan check, permit and connection fees vary widely between cities.

Our feasibility study looks at each of these before you sign anything, so the number you plan around is the real one.

Frequently asked questions

How much does it cost to build a 400 square foot ADU?

In California, plan on roughly $150,000 to $250,000 for a finished, permitted, detached ADU of around 400 square feet. Our Four Fifty studio is $199,000 and The 405 one-bedroom is $239,000, all-inclusive with a permitting budget, foundation, crane delivery and hookups.

Is a 400 square foot ADU big enough to live in?

Yes. A well-designed 400 to 450 square foot home fits a full kitchen, a full bathroom, a living area and a sleeping area. It suits one person or a couple, an aging parent, an adult child, or a long-term renter.

Can I build a 400 square foot ADU for under $100,000?

A new detached one, rarely, once the foundation, utilities, permits and finishes are counted. A simple garage conversion or a junior ADU inside your home is the likeliest way near that budget. See can you build an ADU for $100K.

Do I pay impact fees on a 400 square foot ADU?

No. California bars local impact fees on ADUs of 750 square feet of interior livable space or less, and school fees on ADUs under 500 square feet. Utility connection fees can still apply to a new detached unit.

How long does a 400 square foot ADU take to build?

Our smallest homes run about 4 to 5 months from contract in the best case, subject to local permitting. The factory build overlaps the site work, which is why small prefab ADUs move faster than site-built ones.

Your next step

  1. Compare the Four Fifty and The 405 side by side.
  2. Read what drives ADU pricing in ADU cost in California.
  3. Book a free Online Property Analysis on our contact page, and we’ll talk through your lot.

Next Step · Pricing

14 models, 199K to 599K all-inclusive →

Every model with its price and size, from permits to appliances.

Form not loading? Open it directly →

Talk to a Real Person

Have a question this didn't answer?

Tell us a bit about your property below, and one of our Account Managers will follow up with a straight answer, not a form letter. Or call (831) 432-7721 directly.

  • A shortlist of models worth exploring for your goals
  • Honest flags on anything property-specific, like slope or septic
  • A clear next step, whether that is a factory tour or a feasibility study
  • No pressure, and no obligation

Building more than one? If you're a real estate developer or investor planning multiple units, let us know in the form. We offer better pricing at volume.

“My first telephone conversation with Cathy (Owner) was one of the best, positive and kind discussions. She was thinking outside of the box and provided a possible solution like a family member. Thank you.”

Vijay

on Google

Book my property analysisFree and online, about 30 minutes
Start