ADU Pricing · 2026
Studio ADU Cost in California (2026)
A studio ADU in California starts at $199,000 with Framework First, and that price is built around a permitting budget, not a stripped-down base that permits and site work get added onto later. Our Four Fifty model is a 450 square foot studio with one full bathroom, and the $199,000 covers a permitting budget, plans, foundation, the factory-built home, crane delivery, utility hookups, appliances and project management through final inspection. Your exact permit costs and any property-specific site work get confirmed in the feasibility study, so you know the real number before you commit.
The short version: A finished studio ADU through Framework First starts at $199,000 all-inclusive (our Four Fifty model, 450 sq ft, 1 bath). That price includes a permitting budget, plans, foundation, build, delivery, hookups and appliances. A studio is the right call when your priority is the lowest entry price, a tight lot, or a private space for one person.
On this page
What a studio ADU actually costs
When people search for a studio ADU cost, they usually get a confusing range because many quotes start with a base “shell” price and add permits, site work, utility connections and appliances as line items later. We do it the other way: a permitting budget, plans and appliances are built into the price from the start, with your exact permit costs and any property-specific site work confirmed up front in the feasibility study. For every lever that brings an ADU’s total down, see our guide to the cheapest way to build an ADU.
Our entry-level studio, the Four Fifty, is $199,000, permitting budget included. Here is how it sits next to the next few models, so you can see what your money buys as you step up in size:
| Model | Size | Beds / Baths | All-inclusive price* | Build time** |
|---|---|---|---|---|
| Four Fifty (studio) | 450 sq ft | Studio / 1 bath | $199,000 | About 4 months, best case |
| The 405 | 405 sq ft | 1 bed / 1 bath | $239,000 | About 5 months |
| Five Five Five | 555 sq ft | 1 bed / 1 bath | $279,000 | About 5 months |
| Six Sixty | 660 sq ft | 1 bed / 1 bath | $309,000 | About 5 months |
*Includes a permitting budget, not final permit costs. Permits and property-specific site work (septic, retaining walls and similar) vary by property and are confirmed in your feasibility study.
**From contract signing, subject to your city’s permitting timeline.
The Four Fifty is the most affordable home we build. It is a bright, efficient open-plan space with a full kitchen and a full bathroom, designed so it never feels cramped despite the compact footprint. For a deeper look at the whole range, see our full breakdown of how much an ADU costs in California.
What “all-inclusive” includes
The $199,000 covers the parts that often show up later as separate line items:
- A permitting budget, plus plans drawn and submitted for you
- Foundation and the site connections it needs
- The home itself, built roughly 97% in our Salinas factory
- Crane delivery and set on your prepared site
- Utility hookups (water, sewer, electrical)
- Appliances installed and ready to use
- Project management through final inspection
The main thing a listed price cannot predict is your specific lot. Steep grades, long utility runs or unusual access can add site-prep costs. Our team identifies those in the feasibility study before you commit, so you see them on paper first.
When a studio ADU is the right choice
A studio is not “the cheap option you settle for.” For a lot of homeowners it is the smartest fit. Choose a studio when:

- Price is your first priority. At $199,000, the Four Fifty is the lowest-cost path to a permitted, finished home in your backyard in our lineup.
- Your lot is tight. A 450 square foot footprint can fit small or oddly shaped lots where a larger L-shaped home would not fit within setbacks.
- It is for one person. A studio suits a single tenant, an independent parent, an adult child gaining independence, or a home office or guest suite.
- You want the fastest build. The Four Fifty takes about 4 months in the best case, the quickest in our lineup, subject to your city’s permitting timeline.
When to size up instead
If you want more rental income, a second bedroom is usually what pays you back. In federal Fair Market Rent data, a one-bedroom’s benchmark sits only slightly above a studio’s in Monterey, Santa Cruz and San Benito counties, while a two-bedroom’s is several hundred dollars a month higher. If income is the goal, weigh the studio against a two-bedroom layout like the Six Sixty Duo. Our 1-bedroom ADU cost guide compares all three one-bedroom plans side by side, and our guide to how much rent an ADU can earn walks through the math.
A one-bedroom earns its place on privacy. For a parent who wants a real bedroom with a door that closes, it is often worth the step up. We cover that decision in detail in our guide to building an ADU for aging parents.
Studio ADU rules in California (2026)
California state law makes studios straightforward to permit, and it limits many local restrictions. These points come from the California Department of Housing and Community Development’s ADU Handbook (March 2026):
- Size: A city’s maximum ADU size has to allow at least 850 square feet of interior livable space, so a 450 sq ft studio sits well within what every city must allow.
- A 60-day decision. When there is an existing home on the lot, your city must approve or deny a complete ADU application within 60 days.
- No owner-occupancy requirement for a standard ADU. You do not have to live on the property. A JADU, a junior ADU built inside your existing home, requires owner-occupancy only when it shares a bathroom with the main house.
- No impact fees at 750 sq ft or less. An ADU with 750 square feet of interior livable space or less is exempt from impact fees charged by local agencies, special districts and water corporations. Building permit and plan check fees are separate, and your school district may charge school fees on an ADU over 500 square feet.
- Parking: at most one space per unit or bedroom, whichever is less, and none at all in several cases, such as within a half-mile walk of public transit or in a historic district.
A detached studio ADU is its own building, which is different from a JADU carved out of your existing house. If you are weighing the two, our JADU vs ADU comparison lays out the trade-offs. For the full legal picture, see our guide to California ADU laws in 2026.
How homeowners pay for a studio ADU
Even at the lowest entry price in our lineup, most families do not pay $199,000 in cash. Common paths include a home equity line of credit (HELOC), a cash-out refinance, a renovation loan or an ADU-specific construction loan. A studio also means the smallest loan amount of any model we build. We break down the options in our guide to financing an ADU in California, including how to finance one without a lot of cash on hand.
Frequently asked questions
How much does a studio ADU cost in California?
With Framework First, a studio ADU starts at $199,000 with a permitting budget built in: our Four Fifty model, 450 square feet with one full bathroom. That price also covers plans, foundation, the factory build, crane delivery, utility hookups and appliances. Your exact permit costs and any property-specific site work are the variables, and both are confirmed in your feasibility study.
How big is a studio ADU?
Our Four Fifty studio is 450 square feet, an open-plan layout with a full kitchen and full bathroom. State law requires every city’s size limit to allow at least 850 square feet of interior livable space, so a studio sits at the smaller, more affordable end of the range. For the full size picture, see how big an ADU can be in California.
Is a studio or a one-bedroom ADU a better value?
It depends on your goal. If you want the lowest price and fastest build, the studio wins at $199,000 and about 4 months in the best case. If you want a separate bedroom for a parent or a tenant, a one-bedroom is worth the step up. For rent alone, federal benchmark rents for a one-bedroom sit only slightly above a studio’s in most of the counties we serve, so if income is the main goal, compare the studio with a two-bedroom.
How long does it take to build a studio ADU?
About 4 months for our Four Fifty in the best case, the fastest in our lineup, subject to your city’s permitting timeline. About 97% of the home is built in our Salinas factory while your site is prepared. See how long it takes to build an ADU for the full timeline.
Will a studio ADU add value to my home?
A permitted, finished ADU adds livable square footage and can earn rental income, and both can support resale value. How much depends on your market and how the appraiser treats it. Our guide to ADU appraisal and resale value covers how appraisers look at them.
Ready to see your studio ADU number?
The clearest way to know what a studio ADU will cost on your lot is a feasibility study. Our team checks your zoning, setbacks and utilities, then confirms whether the Four Fifty fits, your exact permit costs and any site-specific work. It is $497 for a standard property or $997 for an empty lot. If your property cannot host an ADU, you get a full refund minus payment processing fees, and if you sign with us within 90 days, the fee is credited toward your build.
Start your feasibility study and get real numbers for your property.