Category · Process

ADU process guides.

Build quality, factory vs site-built, eligibility, and what to expect at each step.

16 guides

Process

What Is an ADU Feasibility Study, and Do You Need One?

What an ADU feasibility study checks (zoning, setbacks, utilities, septic, overlays), how it differs from a free property analysis, its cost and red flags.

November 2, 2026 · 10 min

Process

ADU Maintenance Guide: Caring for a Factory-Built Home

ADU maintenance guide: mini-split filter cleaning, fiber-cement siding and composite deck care, gutters, water heater basics and an annual checklist.

October 17, 2026 · 8 min

Process

ADU Site Preparation: What to Expect Before Delivery Day

ADU site preparation: what happens before a factory-built ADU arrives, from survey and grading to the foundation, utility stub-outs and crane access.

October 16, 2026 · 8 min

Process

ADU Floor Plans: How to Choose the Right Layout

How to choose an ADU floor plan: bedrooms vs square footage, rectangle, L and U footprints, and how lot shape and setbacks narrow what fits your yard.

October 15, 2026 · 9 min

Process

Building a Home on a Vacant Lot in California: What Changes

Building a home on a vacant lot in California: utilities from scratch, septic and soil tests, grading, crane access and the $997 empty-lot feasibility study.

October 14, 2026 · 9 min

Process

What Foundation Does a Prefab ADU Use?

What foundation does a prefab ADU use? A permanent slab or raised foundation poured on your lot while the home is built in our factory at the same time.

September 28, 2026 · 6 min

Process

How Does ADU Crane Delivery Work?

How ADU crane delivery works: truck transport from our Salinas factory, a same-day crane set onto your new foundation, and the site access a crane needs.

September 19, 2026 · 6 min

Process

How Do ADU Utility Hookups Work?

How ADU utility hookups work: water, sewer or septic, electrical and gas, and when an ADU ties into your home's service or gets a new dedicated line.

September 18, 2026 · 6 min

Process

Do I Need an Architect for an ADU?

Do I need an architect for an ADU? Usually not. Plans must be prepared for permitting, and a factory builder like Framework First handles that in-house.

September 15, 2026 · 6 min

Process

Does an ADU Need a Separate Utility Meter?

A separate utility meter is not required for most ADUs. Learn when a shared meter works, when a separate one makes sense, and how to decide for your project.

September 15, 2026 · 4 min

Process

ADU Electrical Panel Upgrade Requirements

Does building an ADU mean upgrading your home's electrical panel? Here's how the decision gets made, who makes it, and what to expect during planning.

August 26, 2026 · 5 min

Process

How Long Does It Take to Build an ADU in California? (2026)

Framework First ADUs take about 4 to 9 months by model, with permit timing set by your city. Site-built ADUs often take 16 to 24 months. See each step.

August 24, 2026 · 12 min

Process

Does an ADU Need Its Own Address?

Does an ADU need its own address? Many California cities assign one to a detached ADU for mail, utilities and emergency response, but the rule is local.

August 23, 2026 · 6 min

Process

How Is a Prefab ADU Built? The 7 Build Phases

How is an ADU built? About 97% of a Framework First home is built in our Salinas factory, then delivered by crane. See the materials and quality checks.

August 2, 2026 · 9 min

Process

Garage Conversion to ADU: Costs, Permits and When It Pays Off

Garage conversion to ADU in California: typical costs, the permit path, what you keep and lose, and how it compares with a new factory-built ADU.

May 29, 2026 · 8 min

Process

Can I Build an ADU on My Property? (California Eligibility)

Can I build an ADU on my property? A plain-English California checklist: lot size, setbacks, parking and the state laws that make most lots eligible.

May 26, 2026 · 3 min

Form not loading? Open it directly →

Ready For The Real Numbers?

Let's see what these guides mean for your lot.

Reading is great. Knowing what's actually possible on your specific property is better. Tell us a bit about it below, and a real person on our team will follow up, free, no pressure.

  • A shortlist of which models actually fit your lot
  • Honest flags on anything property-specific, like slope or septic
  • A clear next step, whether that is a factory tour or a feasibility study
  • No pressure, and no obligation

Building more than one? If you're a real estate developer or investor planning multiple units, let us know in the form. We offer better pricing at volume.

“My first telephone conversation with Cathy (Owner) was one of the best, positive and kind discussions. She was thinking outside of the box and provided a possible solution like a family member. Thank you.”

Vijay Kumar

on Google

See If My Property QualifiesFree property analysis
Start